References
|
PLEASE CHOOSE |
|
 |
|
| |
INGENO Europrojekte | I04s020 |
 |
 |
Railway Project in East Africa |
| |
With a feasibility study for the construction and operation of a railway link, the INGENO Group has laid the foundation for the implementation of a unique transport project in Sudan. (more) |
 |
| |
INGENO Europrojekte | I00s167 |
 |
 |
ABS Hamburg–Berlin |
| |
One of the busiest lines in Germany, Berlin – Spandau West – Hamburg Central Station has a total length of 283 km and 21 stations. INGENO Europrojekte GmbH has been entrusted with the technical equipment planning for upgrading the line to a speed of 230 kph. (more) |
 |
| |
INGENO Europrojekte | I00s112 |
 |
 |
Magdeburg Railway Node |
| |
The upgrading of the Magdeburg railway node has been identified as one of the key priorities in the Federal Transport Facilities Plan. INGENO Europrojekte GmbH has been entrusted with the technical equipment planning of the first upgrading stage. (more) |
 |
| |
GQS | G00g002 |
 |
 |
Expert Testing of Leipzig Sub-Control Centre Nodes |
| |
Leipzig station is Europe’s largest railway terminus. Within the framework of the modernisation of the station’s track equipment, GQS is responsible for the supervision of the first commissioning stage. (more) |
 |
| |
GQS | G00g001 |
 |
 |
Approval of Sachsen Magistrale |
| |
The Sachsenmagistrale is one of the traffic routes between old and new countries whose development is prioritised in the context of German unification. GQS was responsible for the plan inspection and approval procedures. (more) |
 |
| |
INGENO Europrojekte | B06P008 |
 |
 |
High-speed line Wuhan-Guangzhou |
| |
In the People's Republic of China the nearly 1,000-kilometer High-speed Dedicated Passenger Line (PDL) between Wuhan and Guangzhou is near completion and will be operational at the end of 2009. The INGENO Europrojekte GmbH participated by an engineering contract in consulting the Chinese owner regarding interface management and the work of the superstructure disciplines. (mehr) |
 |
| |
BPG | B02b018 |
 |
 |
Munich S-Bahn Main Line |
| |
From December 2004 the ten-minute frequency will be introduced in the Munich S-Bahn network, so that it can better cope with the 750,000 daily passengers. Within the scope of this major project, the BPG Bauüberwachungs- und Projektsteuerungsgesellschaft mbH was responsible for the construction supervision. (more) |
 |
| |
BPG | B00b005 |
 |
 |
Berlin Railway Node |
| |
Complete reinstatement of the Berlin suburban rail system (S-Bahn) and improved connection to the Berlin long-distance rail network have been a priority objective since the reunification. BPG Bauüberwachungs- und Projektsteuerungsgesellschaft mbH is responsible for the technical equipment of this multistage project. (more) |
 |
|
 |
 |
NEWS |
 |
 |
 |
| 26.10.2005 |
 |
| Modernisation of signalling systems in Latvia |
 |
| INGENO Europrojekte GmbH strengthens its presence in the Eastern European region: Alcatel SEL AG Stuttgart has entrusted the company with the implementation planning for signalling systems and underground cabling on the railway link between the Belorussian border near Indra and Ventspils, Latvia’s major port. In addition, INGENO Europrojekte GmbH has been awarded the order to manage and monitor the surveying works, as part of the basic analysis, on the so-called east-west corridor. |
|
 |
 |
|