INGENO Europrojekte | I00s167
ABS Hamburg–Berlin
One of the busiest lines in Germany, Berlin – Spandau West – Hamburg Central Station has a total length of 283 km and 21 stations. INGENO Europrojekte GmbH has been entrusted with the technical equipment planning for upgrading the line to a speed of 230 kph.
The purpose of the upgrade is to optimise the line as a superior
alternative to road transport, making it even more attractive for
business travellers. In February 2002, as part of an agreement among
the Federal Ministry for Transport, Building and Housing, the relevant
countries and DB AG, it was decided to shorten the travel time between
Hamburg and Berlin to less than 100 minutes. In the first stage of
construction, the line was already upgraded and electrified for a speed
of 160 kph. The Hamburg-Berlin section will be upgraded to 230 kph by
the end of 2004. The line upgrade calls for a total investment of 1.4
billion euro, which goes into the overhaul of tracks and roadbed, the
elimination of 54 level crossings, the reconversion of platforms in 21
stations and the installation of modern signalling and control
equipment.
Alongside the technical equipment planning, INGENO Europrojekte GmbH
was responsible for the co-ordination of all planning documents for
this line upgrading project. Apart from the preparation of the overall
project design, the work included all associated works for the control
and signalling equipment (more than 300), the final elaboration of the
safety relevant aspects for the computerised signal box technology, the
planning of the technical equipment for the level crossing replacement
options and the planning of the cab signalling (continuous automatic
train running control). Moreover, INGENO Europrojekte GmbH participated
in the preparation of the overall project scheduling and supported the
implementation management for the technical equipment of the line with
its own employees.
|
 |
 |
INGENO Europrojekte REFERENCES |
 |
 |
 |
| I04s020 |
 |
| Railway Project in East Africa |
 |
| With a feasibility study for the construction and operation of a railway link, the INGENO Group has laid the foundation for the implementation of a unique transport project in Sudan. |
 |
| I00s167 |
 |
| ABS Hamburg–Berlin |
 |
| One of the busiest lines in Germany, Berlin – Spandau West – Hamburg Central Station has a total length of 283 km and 21 stations. INGENO Europrojekte GmbH has been entrusted with the technical equipment planning for upgrading the line to a speed of 230 kph. |
|
 |
 |
 |
NEWS |
 |
 |
 |
| 26.10.2005 |
 |
| Modernisation of signalling systems in Latvia |
 |
| INGENO Europrojekte GmbH strengthens its presence in the Eastern European region: Alcatel SEL AG Stuttgart has entrusted the company with the implementation planning for signalling systems and underground cabling on the railway link between the Belorussian border near Indra and Ventspils, Latvia’s major port. In addition, INGENO Europrojekte GmbH has been awarded the order to manage and monitor the surveying works, as part of the basic analysis, on the so-called east-west corridor. |
|
 |
 |
|